高电压技术  2019, Vol. 45 Issue (10): 3140-3148    DOI: 10.13336/j.1003-6520.hve.20190924013
  智能配电网柔性互联关键技术专题 本期目录 | 过刊浏览 | 高级检索 |
含柔性多状态开关的配电网多目标随机运行优化方法
张今1, 耿光超1, 江全元1, 王朝亮2, 许烽2
1. 浙江大学电气工程学院,杭州310027;
2. 国网浙江省电力有限公司电力科学研究院,杭州310014
Multi-objective Stochastic Operation Optimization for Distribution Network with Flexible Multi-state Switches
ZHANG Jin1, GENG Guangchao1, JIANG Quanyuan1, WANG Chaoliang2, XU Feng2
1. College of Electrical Engineering, Zhejiang University, Hangzhou 310027, China;
2. State Grid Zhejiang Electric Power Co., Ltd. Research Institute, Hangzhou 310014, China
下载:  PDF(2078KB) 
输出:  BibTeX | EndNote (RIS)      
摘要 柔性多状态开关(flexible multi-state switch,FMSS)是一种具有潮流互济和电压支撑功能的新型电力电子装置。为了合理地发挥柔性多状态开关的潜力,在运行优化时可以考虑多个目标函数。提出含柔性多状态开关的配电网多目标随机运行优化模型,该模型以柔性多状态开关出力、常规开关的通断状态和动作时间作为优化变量,包含网络重构和柔性多状态开关调控2个子问题,可以采用双层规划模型的基本思想求解;通过场景树模拟分布式电源(distributed generation, DG)的出力情况,划分重构时段并以此为基础优化进行网络重构的时间,采用强度帕累托进化算法计算网络重构和柔性多状态开关出力的帕累托最优解集,并通过隶属度函数选择最终的运行方案;通过改进的IEEE-33节点配电网算例,验证了方法的有效性。结果表明,运行优化方法能够改善配电网的多个运行指标,并且在不同的分布式电源渗透率下均取得良好效果。
服务
加入引用管理器
E-mail Alert
RSS
作者相关文章
张今
耿光超
江全元
王朝亮
许烽
关键词:  柔性多状态开关  网络重构  多目标  场景树  隶属度函数  配电网  强度帕累托进化    
Abstract: Flexible multi-state switch(FMSS) is a new type of power electronic device which has the function of power flow transmission and voltage support. In order to realize the potential of FMSS reasonably, multi objectives may be taken into account during the operation optimization. Therefore, we propose an operation optimization model of the distribution network with FMSS, in which. the power of FMSS, the action time, and on-off state of the conventional switches are taken as optimization variables of the model. The model contains two sub-problems, network reconfiguration and FMSS regulation, and can be solved by the idea of bi-level programming model. Scenario tree is used to simulate the output of the distributed generation(DG). Based on the divided time interval of network reconfiguration, time of network reconfiguration is optimized. Using the strength Pareto evolutionary algorithm, the Pareto optimal solution set of network reconfiguration and FMSS output is solved. Moreover, the final operation method is selected by membership function. Based on improved IEEE-33 bus distribution network, validity of the operation optimization algorithm is verified. The results show that the operation optimization method can be adopted to improve multi operation indexes and works well under a series of DG penetrations.
Key words:  flexible multi-state switch    network reconfiguration    multi-objective    scenario tree    membership function    distribution network    strength Pareto evolution
收稿日期:  2019-06-21      修回日期:  2019-07-28                发布日期:  2019-10-17      期的出版日期:  2019-10-31
基金资助: 国家重点研发计划(2017YFB0903100); 国家电网公司科技项目(521104170043)
通讯作者:  耿光超,1985—,男,博士(后),助理研究员,硕导,研究方向为电力系统稳定与控制、电力系统高性能计算、电力物联网等   
作者简介:  张 今,1995—,女,硕士生,研究方向为智能配电网的规划与运行控制,E-mail: foggy_lu@163.com
引用本文:    
张今, 耿光超, 江全元, 王朝亮, 许烽. 含柔性多状态开关的配电网多目标随机运行优化方法[J]. 高电压技术, 2019, 45(10): 3140-3148.
ZHANG Jin, GENG Guangchao, JIANG Quanyuan, WANG Chaoliang, XU Feng. Multi-objective Stochastic Operation Optimization for Distribution Network with Flexible Multi-state Switches. HIGH VOLTAGE ENGINEERING, 2019, 45(10): 3140-3148.
链接本文:  
http://hve.epri.sgcc.com.cn/CN/10.13336/j.1003-6520.hve.20190924013  或          http://hve.epri.sgcc.com.cn/CN/Y2019/V45/I10/3140
[1] 于文鹏,刘东,余南华. 馈线控制误差及其在主动配电网协调控制中的应用[J]. 中国电机工程学报,2013,33(13):108-115.
YU Wenpeng, LIU Dong, YU Nanhua.Feeder control error and its application in coordinate control of active distribution network[J]. Proceedings of the CSEE, 2013, 33(13): 108-115.
[2] 于汀,蒲天骄,刘广一,等. 基于柔性直流分区互联的受端城市电网无功电压控制策略[J]. 高电压技术,2017,43(7):50-55.
YU Ting, PU Tianjiao, LIU Guangyi, et al.Reactive power and voltage control strategy of receiving-end urban power grid with flexible DC interconnected between partitions[J]. High Voltage Engineering, 2017, 43(7): 50-55.
[3] 张亚超,刘开培,廖小兵,等. 含大规模风电的电力系统多时间尺度源荷协调调度模型研究[J]. 高电压技术,2019,45(2):600-608.
ZHANG Yachao, LIU Kaipei, LIAO Xiaobing, et al.Multi-time scale source-load coordination dispatch model for power system with large-scale wind power[J]. High Voltage Engineering, 2019, 45(2): 600-608.
[4] 瞿合祚,李晓明,杨玲君,等. 考虑负荷和分布式电源时变性的配电网多目标动态重构和DG调度[J]. 高电压技术,2019,45(3):873-881.
QU Hezuo, LI Xiaoming, YANG Lingjun, et al.Multi-objective distribution network dynamic reconfiguration and DG control considering time variation of load and DG[J]. High Voltage Engineering, 2019, 45(3): 873-881.
[5] CAO W, WU J, JENKINS N, et al.Benefits analysis of soft open points for electrical distribution network operation[J]. Applied Energy, 2016, 165: 36-47.
[6] BLOEMINK J M, GREEN T C.Increasing distributed generation penetration using soft normally-open points[C]∥Proceedings of the 2010 IEEE PES General Meeting. Minneapolis, USA: IEEE, 2010: 1-8.
[7] 李振兴,田斌,尹项根,等. 含分布式电源与随机负荷的主动配电网保护[J]. 高电压技术,2017,43(4):181-188.
LI Zhenxing, TIAN Bin, YIN Xianggen, et al.Overview on active distribution network relaying protective containing distributed resources and stochastic load[J]. High Voltage Engineering, 2017, 43(4): 181-188.
[8] 王成山,孙充勃,李鹏,等. 基于SNOP的配电网运行优化及分析[J]. 电力系统自动化,2015,39(9):82-87.
WANG Chengshan, SUN Chongbo, LI Peng.SNOP-based operation optimization and analysis of distribution networks[J]. Automation of Electric Power Systems, 2015, 39(9): 82-87.
[9] 晏阳,廖清芬,胡静竹,等. 基于SNOP的主动配电网多时间尺度优化策略[J]. 电力建设,2016,37(2):125-131.
YAN Yang, LIAO Qingfen, HU Jingzhu, et al.Multi-time scale optimization strategy of active distribution network based on SNOP[J]. Electric Power Construction, 2016, 37(2): 125-131.
[10] 王成山,宋关羽,李鹏,等. 一种联络开关和智能软开关并存的配电网运行时序优化方法[J]. 中国电机工程学报,2016,36(9):2315-2321.
WANG Chengshan, SONG Guanyu, LI Peng, et al.A hybrid optimization method for distribution network operation with SNOP and tie switch[J]. Proceedings of the CSEE, 2016, 36(9): 2315-2321.
[11] JI H, WANG C, PENG L, et al.Robust operation of soft open points in active distribution networks with high penetration of photovoltaic integration[J]. IEEE Transactions on Sustainable Energy, 2018, 10(1): 280-289.
[12] POPOVIC D S, CIRIC R M.A multi-objective algorithm for distribution networks restoration[J]. IEEE Transactions on Power Delivery, 1999, 14(3): 1134-1141.
[13] QI Q, WU J, ZHANG L, et al.Multi-objective optimization of electrical distribution network operation considering reconfiguration and soft open points[J]. Energy Procedia, 2016, 103: 141-146.
[14] 雷宇,杨明,韩学山. 基于场景分析的含风电系统机组组合的两阶段随机优化[J]. 电力系统保护与控制,2012,40(23):58-67.
LEI Yu, YANG Ming, HAN Xueshan.A two-stage stochastic optimization of unit commitment considering wind power based on scenario analysis[J]. Power System Protection and Control, 2012, 40(23): 58-67.
[15] 郑欢,江道灼,杜翼. 交流配电网与直流配电网的经济性比较[J]. 电网技术,2013,37(12):3368-3374.
ZHENG Huan, JIANG Daozhuo, DU Yi.Economic comparison of AC and DC distribution system[J]. Power System Technology, 2013, 37(12): 3368-3374.
[16] 江东林,刘天琪,李樊. 采用时段动态划分和分层优化策略的配电网重构[J]. 电网技术,2012,36(2):153-157.
JIANG Donglin, LIU Tianqi, LI Fan.Dynamic distribution network reconfiguration based on dynamic partition of time intervals and hierarchical optimization[J]. Power System Technology, 2012, 36(2): 153-157.
[17] ZITZLER E, THIELE L.Multiobjective evolutionary algorithms: a comparative case study and the strength Pareto approach[J]. IEEE Transactions on Evolutionary Computation, 1999, 3(4): 257-271.
[18] PANDA S.Multi-objective PID controller tuning for a FACTS-based damping stabilizer using non-dominated sorting genetic algorithm-II[J]. Electrical Power and Energy Systems, 2011, 33(7): 1296-1308.
[19] 赵志刚,顾新一,李陶深. 求解双层规划模型的粒子群优化算法[J]. 系统工程理论与实践,2007,27(8):92-98.
ZHAO Zhigang, GU Xinyi, LI Taoshen.Particle swarm optimization for bi-level programming programming problem[J]. System Engineering Theory and Practice, 2007, 27(8): 92-98.
[20] 杨叔子,吴雅,轩建平. 时间序列分析的工程应用[M]. 2版. 武汉:华中科技大学出版社,2007.
YANG Shuzi, WU Ya, XUAN Jianping.Time series analysis in engineering application[M]. 2nd ed. Wuhan, China: Huazhong University of Science and Technology Press, 2007.
[21] CHEN P C, SALCEDO R, ZHU Q, et al.Analysis of voltage profile problems due to the penetration of distributed generation in low-voltage secondary distribution networks[J]. IEEE Transactions on Power Delivery, 2012, 27(4): 2020-2028.
[22] KEANE A, OCHOA L F, VITTAL E, et al.Enhanced utilization of voltage control resources with distributed generation[J]. IEEE Transactions on Power Systems, 2011, 26(1): 252-260.
[23] KEANE A, O"MALLEY M. Optimal utilization of distribution networks for energy harvesting[J]. IEEE Transactions on Power Systems, 2007, 22(1): 467-475.
[1] 邱亚, 李鑫, 陈薇, 段泽民. 基于P-AWPSO算法的全钒液流电池储能系统功率分配[J]. 高电压技术, 2020, 46(2): 500-510.
[2] 李相俊, 马锐, 王上行, 张宇, 李蓓, 方陈. 考虑电池寿命的商业园区储能电站运行控制策略[J]. 高电压技术, 2020, 46(1): 62-70.
[3] 吴鸣, 孙丽敬, 寇凌峰, 屈小云. 考虑需求侧响应的主动配电网电池梯次储能的容量配置方法[J]. 高电压技术, 2020, 46(1): 71-79.
[4] 张贺军. 10 kV主动干预型消弧装置试验研究[J]. 高电压技术, 2019, 45(zk2): 327-332.
[5] 郭胜辉, 李程, 刘俊华, 张健, 杨兰均. 考虑负荷特性的配电网串联补偿方法研究[J]. 高电压技术, 2019, 45(zk2): 176-180.
[6] 郭凌旭, 王刚, 陈建, 孔祥玉, 郄洪涛. 应用高精度量测技术消除配电网母线信号噪声[J]. 高电压技术, 2019, 45(zk2): 225-231.
[7] 方恒福, 盛万兴, 肖茂祥, 王金丽, 杨红磊, 吕东飞, 王利, 刘文安. 基于目标网架的复杂电缆网网格化划分方法研究[J]. 高电压技术, 2019, 45(zk): 167-174.
[8] 杨志淳, 刘农一, 沈煜, 杨帆, 宿磊, 张俊, 陈进, 顾然. 基于智能配变终端的低压配电网故障主动研判[J]. 高电压技术, 2019, 45(zk): 264-268.
[9] 杨志淳, 徐志超, 沈煜, 杨帆, 宿磊, 汪开新, 李天平. 基于物联网的低压配电网漏电保护器监测与应用[J]. 高电压技术, 2019, 45(zk): 137-141.
[10] 米师农, 张建成, 郭伟. 基于改进FPA算法的互联微电网优化调度模型[J]. 高电压技术, 2019, 45(9): 2849-2856.
[11] 李斌, 马久欣, 温伟杰, 刘海金, 陈争光, 王一振. 适用于中压直流配电网的新型多端口机械式直流断路器[J]. 高电压技术, 2019, 45(8): 2385-2392.
[12] 田野, 陈维江, 宁昕, 韩洪刚, 边凯, 周力骏. 配电网户外架空设备非接触式带电检测技术研究进展[J]. 高电压技术, 2019, 45(8): 2495-2501.
[13] 吕军, 盛万兴, 刘日亮, 王鹏, 吕广宪, 林佳颖, 张治明. 配电物联网设计与应用[J]. 高电压技术, 2019, 45(6): 1681-1688.
[14] 吴姗姗, 宁昕, 郭屾, 郭欢. 配电物联网在新产业形态中的应用探讨[J]. 高电压技术, 2019, 45(6): 1723-1728.
[15] 张冀川, 陈蕾, 张明宇, 王鹏, 房牧, 孙浩洋. 配电物联网智能终端的概念及应用[J]. 高电压技术, 2019, 45(6): 1729-1736.
[1] WANG Liming, DU Zhen’an. Double Air-gap Current Transformer Applied to High Voltage Transmission Line On-site Mobile Comparison System[J]. 高电压技术, 2015, 41(1): 106 -114 .
[2] LIU Yugen,MI Hongwei,WANG Jiannan,MA Jinpei. Research of Transient Recovery Voltage of Circuit Breaker in Small Capacity Generator Terminal[J]. 高电压技术, 2015, 41(6): 1943 -1950 .
[3] TONG Xiaoyang, LUO Zhongyun. Transmission Line Faults Classification Method Based on Fuzzy Support Vector Machine and Reducing-dimension Display[J]. 高电压技术, 2015, 41(7): 2276 -2282 .
[4] . [J]. 高电压技术, 2016, 42(13): 215 -218 .
[5] . [J]. 高电压技术, 2016, 42(13): 222 -227 .
[6] SHAO Xianjun, HE Wenlin, LIU Haojun, XU Jialong, ZHOU Hua, ZHANG Guanjun. Diagnosis of Partial Discharge by Employing Inner Grading Electrode of Insulating Spacer in Gas Insulated Switchgear[J]. 高电压技术, 2015, 41(1): 184 -193 .
[7] ZHOU Li, LU Tiecheng, LUO Rongbo, ZHANG Bo, YU Guangkai, WAN Jiawei. Detection and Evaluation Method of Electrical Contact State in Gas Insulated Switchgear[J]. 高电压技术, 2015, 41(1): 217 -224 .
[8] A.A. Trenkin, V.I. Karelin. On Acceleration of Current Channels Heads at Discharge Gaps Bridging[J]. 高电压技术, 2015, 41(2): 534 -538 .
[9] SHI Jian, SIMA Wenxia, YANG Qing, CAO Xuefei, YU Fei. Simulation Analysis of the Effect of Nanoparticles on Streamer Development in Transformer Oil[J]. 高电压技术, 2015, 41(2): 424 -431 .
[10] REN Shuangzan, PU Lu, HUANG Guoqiang, ZHONG Lisheng, YU Qinxue, CAO Xiaolong. Correlation Analysis on Streaming Electrification and Corrosive Sulfur Concentration in Mineral Insulation Oil Used in Power Transformer[J]. 高电压技术, 2015, 41(2): 440 -445 .
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
 
版权所有 © 2014 《高电压技术》编辑部
本系统由北京玛格泰克科发展有限公司设计开发